Geothermal Direct Use Study in Mataloko

Client
United Nation Development Program (UNDP)
Brief of Task

UNDP thru its grant for EBTKE to provide direct use design of Mataloko. The Consultant required to do pre assessment of direct use implementation on surrounding of geothermal area, produced some options and proposed. After selected, then the Consultant conduct an engineering design to implement of technology.

Period
2021

Technical Surface Facility Due Diligence of PGE’s asset

Client
Pertamina Geothermal Energy
Brief of Task

The task is to evaluate 5 producing geothermal facilities include the safety concern, geotechnical hazards, and civil. The consultant was also demanded to review and comment the technical inputs of financial models of those geothermal facilities.

Period
2021

Silica scaling mitigation plant, Indonesia

Client
PT Geo Dipa Energi (Persero)
Brief of Task

Design a pilot plant for the treatment of geothermal water to mitigate scaling of the geothermal water to be used in a new expansion. The pilot plant tests the treatment of the geothermal water in order to reduce silica scaling before the design and construction of an expansion unit of the geothermal power plant. The task was to provide a complete solution, including; design and engineering, manufacturing, operation and commissioning and training in the operation of the plant.

Period
2021

Geothermal Direct Use, Opportunity Study, Indonesia

Client
World Bank, PGE
Brief of Task

Study investigating the opportunities for direct use in PGE geothermal power plants. Tasks included making an overview of possilities, mapping of opportunities, and preparing a road map; including three selected opportunities to be studied further.

Period
2020-2022

Dieng 2 Patuha 2: Drilling Engineering and Operation

Client
Geo Dipa Energy
Brief of Task

The Consultant was requested to produce drilling documents includes programs, and drilling contracts to be tendered. Further, the Consultant is contracted to assist drilling operation of the Project. The project is designed to produce more 55 MW of each Patuha and Dieng as additional existing power plant. With financial aid from the Asian Development Bank (ADB), the project became very important

Period
2020 - 2023

The Technical Assessment and Geothermal Industrial Analysis for GREM Program

Client
PT Sarana Multi Infrastruktur (SMI)
Brief of Task

The SMI is chosen by the Indonesia Government to manage the green loan provided by the World Bank thru its program called the Geothermal Resources Risk Mitigation (GREM). The task given was to provide the technical assessment on the program by giving thorough information on the technical risk/aspects of geothermal industry. The document is fundamental for following the compliance procedures in the Indonesian government regulation.

Period
2020

NIL 1 & 2, Sarulla, Indonesia

Client
Hyundai [EPC Contractor]
Brief of Task

The NIL 1 and NIL 2 geothermal power plants (2×110 MW), are a part of the Sarulla Geothermal Power Project in the Tapanuli Utara district, North Sumatra province, Indonesia. The tasks were to perform a review of process flow- and P&I diagrams, hydraulic calculations (steady state and dynamic), review of control- and operation philosophy and a review of Hazop study.

Period
2018

SIL, Sarulla, Indonesia

Client
Hyundai [EPC Contractor]
Brief of Task

The SIL Geothermal power plant (110 MW), is part of the Sarulla Geothermal Power Project in the Tapanuli Utara district, North Sumatra province, Indonesia. The tasks were to perform an optimization of steam supply system, optimization of condensate system and review of control- and operation philosophy.

Period
2017

Biliran, Geothermal Project, Philippines

Client
Orka Energy
Brief of Task

The SIL Geothermal power plant (110 MW), is part of the Sarulla Geothermal Power Project in the Tapanuli Utara district, North Sumatra province, Indonesia. The tasks as the Owner’s Engineer for the project included well design review, steam gathering system and initial power plant design, Project Management, Resident Engineer and supervision.

Period
2014